Skip to main navigation.
Report a Power Outage: 970-887-3378

204.06 Meter Test Fee

No charge shall be made for a meter test except as provided in this rule. If Customer’s meter has been tested at Customer’s request and within a period of two years the Customer requests a new test, the Cooperative shall make the test but if the meter is found to be within the accuracy standards established by the American National Standards Institutes, Inc., the Cooperative may charge the Customer a fee that reflects the cost to test the meter. The Fee shall be based on 50% of the current hourly wage rate in effect for the Senior Meter Technician, plus 40% for overhead costs, rounded to the next dollar.

Powered by Touchstone Energy Cooperatives Logo