Skip to main navigation.
Report a Power Outage: 970-887-3378

205.03 Indirect Charges

The indirect costs of the Cooperative that will be included to determine construction charges for site-specific line extension contracts shall be an annually determined percentage of direct labor costs and an annually determined percentage of direct material costs. The Cooperative will base these percentages on the prior calendar year’s actual costs and publish those percentages in the current edition of the Cooperative’s “Electric Service Construction Standards.”

Powered by Touchstone Energy Cooperatives Logo