Skip to main navigation.
Report a Power Outage: 970-887-3378

Large Commercial Application

To apply for a Large Commercial Service, please fill out the form below.  Enter "N/A" where not applicable or "none" where appropriate.  At the end of the application you will be able to hit the submit button, which will email the application to Mountain Parks Electric, Inc.  After we have reviewed your application we will contact you to schedule a site visit and collect the required $500.00 engineering deposit.  If you have questions regarding the application or have questions, please feel free to contact the MPEI Engineering Department at 970-887-3378
Option 3.

Enter the project name
Enter the name of the developer/owner
Enter the developer/owner contact person
Enter the developer/owner's phone number
Enter the developer/owner's email address
Enter the name of the electrical consultant
Enter the name of the electrical consultant's contact person
Enter the electrical consultant contact's phone number
Enter the electrical consultant's contact email address
Enter the general contractor
Enter general contractor contact person
Enter the general contractor contact's phone number
Enter general contractor's contact email address
Enter the name of the electrical subcontractor
Electrical subcontractor contact
Enter the electrical subcontractor contact phone number
Enter in the electrical subcontractor contact email address
Enter the billing name - who will receive the billing
Enter the street address or PO Box to where the bills are to be send
Enter the billing town, state, zip code
Enter the phone number for the billing
Enter the billing address email
Is the site in the town limits?
Enter the town
Is the project within a subdivision?
Enter the name of the subdivision
Enter filing, block, lot
Enter street address
Enter Section, Township, Range, County of Site
Enter size of entrance conduits
Enter quantity of entrance conduits
Enter size of entrance conductors, AL or CU
Enter quantity of entrance conductors, AL or CU
amp
Enter service rating-Amps, main disconnects/total breakers
kW
Enter total connected load/est. maximum NEC demand

If metering on building meter shall be on gabled end front 1/3 of building

Enter the distance from the transformer
Enter lighting quantity
kW
Enter the lighting total kW
Enter the quantity of receptacles
kW
Enter the total kW of the receptacles
Enter the quantity of cooking
kW
Enter total kW of cooking
Enter quantity of water heaters
kW
Enter total kW of water heaters
Enter the quantity of on demand water heaters
kW
Enter total kW of on demand water heaters
Enter the quantity of the duct air heaters
kW
Enter the total kW of duct air heaters
Enter the quantity of unit air heaters
kW
Enter total kW of unit air heaters
Enter quantity of aux strip heaters
kW
Enter total kw of aux strip heaters
Enter quantity of air conditioning
kW
Enter total kW of air conditioning
Enter quantity of heat pumps
kW
Total kW of heat pumps
kW
Enter total kW for 1 ph misc motors
hp
Enter total hp of 1 ph misc motors
kW
Enter total kW of 3 ph misc motors
ph
Enter ph 3 ph misc motors
kW
Enter largest motor kW
ph
Enter largest motor hp
Is variable speed drive start current same as full load
kW
Enter to total kW of standby power
ph
Enter standby power hp

Largest Motor Nameplate Information (for motor starting voltage flicker design)

Enter horsepower rating
Enter code letter or locked rotor amperes
Enter full load amperes
Unknown

Note:  Customer with nonlinear loads, e.g. variable speed drives that create harmonics problems are financially responsible for corrective measures as detailed in the MPEI Tariff Rules and Regulations.

MPEI requires a CAD file.  The requirements are listed in the Electric Service Construction Standards, Part 2.  Please include with the CAD file a written description of the project.

  • Process will be delayed if street address is not posted at site or property corners are not clearly marked during MPEI site visit.
  • Meter location must ne approved my Mountain Parks Electric, Inc.  Any meter work undertaken prior to such approval may required relocations to approved location at the expense of the project owner.
  • I agree that all electrical construction on the above project will meet MPEI requirements as specified in the Electric Service Construction Standards.
  • I agree to pay the non-refundable $500.00 engineering deposit which will be applied toward the cost of the job, site visit, staking, design, contracts, etc. for a period of one year from the date of receipt.
  • Processing the application will not begin until all required information is provided.

This institution is an equal opportunity provider and employer.

 

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
Target Image
Powered by Touchstone Energy Cooperatives Logo