Project Name To apply for a Large Commercial Service, please fill out the form below. Enter "N/A" where not applicable or "none" where appropriate. At the end of the application you will be able to hit the submit button, which will email the application to Mountain Parks Electric, Inc. After we have reviewed your application we will contact you to schedule a site visit and collect the required $600.00 engineering deposit. If you have questions regarding the application or have questions, please feel free to contact the MPEI Engineering Department at 970-887-3378 Option 3. Developer Info Developer/Owner Developer/Owner Contact Developer/Owner Contact's Phone Developer/Owner Contact's Email Electrical Consultant Info Electrical Consultant Electrical Consultant Contact Electrical Consultant Contact's Email Electrical Consultant Contact's Phone General Contractor Info General Contractor General Contractor Contact General Contractor Contact's Phone General Contractor Contact's Email Electrical Subcontractor Info Electrical Subcontractor Electrical Subcontractor Contact Electrical Subcontractor Contact's Email Electrical Subcontractor Contact's Phone Billing Info Billing Name Billing address Address Address 2 City/Town State/Province - None -AlabamaAlaskaAmerican SamoaArizonaArkansasArmed Forces (Canada, Europe, Africa, or Middle East)Armed Forces AmericasArmed Forces PacificCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFederated States of MicronesiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarshall IslandsMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaNorthern Mariana IslandsOhioOklahomaOregonPalauPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUtahVermontVirgin IslandsVirginiaWashingtonWest VirginiaWisconsinWyoming ZIP/Postal Code Billing Phone Billing Email Location Info Location in Town Limits Yes No Town Within a subdivision? Yes No Name of subdivision Filing, Block, Lot Street Address Section, Township, Range County of Site Attach a copy of Property Deed with Legal Description One file only.100 MB limit.Allowed types: gif, jpg, png, bmp, eps, tif, pict, psd, txt, rtf, html, odf, pdf, doc, docx, ppt, pptx, xls, xlsx, xml, avi, mov, mp3, ogg, wav, bz2, dmg, gz, jar, rar, sit, svg, tar, zip. Electric Load Info Secondary Voltage 120/240-1 Phase 3 Wire 120/208-3 Phase 4 Wire wye 120/208- 1 Phase 3- Wire 277/480-3 Phase 4 Wire wye Size of Entrance Conduits Quantity of Entrance Conduits Size of Entrance Conductor(s), AL or CU Quantity of Entrance Conductors, AL or CU Service Rating-Amps, main disconnects/total breakers Total Connected Load/est. Maximum NEC Demand Will the metering on building meter be on gabled end front 1/3 of building? Yes No If metering on building meter shall be on gabled end front 1/3 of building Distance from Transformer Electric Load Summary Lighting Quantity Lighting kW Receptacles Quantity Receptacles kW Cooking Quantity Cooking kW Water Heater Quantity Water Heaters kW On Demand Water Heaters Quantity On Demand Water Heaters kW Duct Air Heater Quantity Duct Air Heaters kW Unit Air Heater Quantity Unit Air Heaters kW Aux Strip Heaters Quantity Aux Strip Heaters kW Air Conditioning 1 Ph 3 Ph Air Conditioning Quantity Air Conditioning kW Heat Pumps 1 Ph 3 Ph Heat Pumps Quantity Heat Pumps kW 1 Ph Misc Motors kW 1 Ph Misc Motors hp 3 Ph Misc Motors kW 3 Ph Misc Motors hp Largest Motor hp Largest Motor kW Variable Speed Drive - starting current same as full load Yes No Standby Power kW Standby Power ph Largest Motor Nameplate Information (for motor starting voltage flicker design) Horsepower rating Code letter or locked rotor amperes Full load amperes Note: Customer with nonlinear loads, e.g. variable speed drives that create harmonics problems are financially responsible for corrective measures as detailed in the MPEI Tariff Rules and Regulations. MPEI requires a CAD file. The requirements are listed in the Electric Service Construction Standards, Part 2. Please include with the CAD file a written description of the project. Process will be delayed if street address is not posted at site or property corners are not clearly marked during MPEI site visit. Meter location must ne approved my Mountain Parks Electric, Inc. Any meter work undertaken prior to such approval may required relocations to approved location at the expense of the project owner. I agree that all electrical construction on the above project will meet MPEI requirements as specified in the Electric Service Construction Standards. I agree to pay the non-refundable $600.00 engineering deposit which will be applied toward the cost of the job, site visit, staking, design, contracts, etc. for a period of one year from the date of receipt. Processing the application will not begin until all required information is provided. ELECTRONIC SIGNATURE (REQUIRED) Sign above CAPTCHA This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.