Note: Customer with nonlinear loads, e.g. variable speed drives that create harmonics problems are financially responsible for corrective measures as detailed in the MPEI Tariff Rules and Regulations.
MPEI requires a CAD file. The requirements are listed in the Electric Service Construction Standards, Part 2. Please include with the CAD file a written description of the project.
- Process will be delayed if street address is not posted at site or property corners are not clearly marked during MPEI site visit.
- Meter location must ne approved my Mountain Parks Electric, Inc. Any meter work undertaken prior to such approval may required relocations to approved location at the expense of the project owner.
- I agree that all electrical construction on the above project will meet MPEI requirements as specified in the Electric Service Construction Standards.
- I agree to pay the non-refundable $600.00 engineering deposit which will be applied toward the cost of the job, site visit, staking, design, contracts, etc. for a period of one year from the date of receipt.
- Processing the application will not begin until all required information is provided.